Toyota Tacoma manuals

Toyota Tacoma 2015-2018 Service Manual: Purge Valve

Components

COMPONENTS

ILLUSTRATION

Inspection

Inspection

INSPECTION

PROCEDURE

1. INSPECT PURGE VSV

(a) Measure the resistance according to the value(s) in the table below.

Text in Illustration

*a

Component without harness connected

(Purge VSV)

Standard Resistance:

Tester Connection

Condition

Specified Condition

1 - 2

20В°C (68В°F)

23 to 26 О©

If the result is not as specified, replace the purge VSV.

(b) Check the operation of the purge VSV.

(1) Apply battery voltage between the terminals of the purge VSV and check that the following occurs when blowing air into the port (E).

Text in Illustration

*a

Port (E)

*b

Port (F)

*c

Air

OK:

Measurement Condition

Specified Condition

Battery voltage applied between terminals 1 and 2

Air flows from port (F)

Battery voltage not applied between terminals 1 and 2

Air does not flow

If the result is not as specified, replace the purge VSV.

Removal

REMOVAL

PROCEDURE

1. REMOVE V-BANK COVER SUB-ASSEMBLY

2. REMOVE PURGE VSV 2. REMOVE PURGE VSV

2. REMOVE PURGE VSV

(a) Slide the hose clip and disconnect the purge line hose from the purge VSV.

(b) Disconnect the purge line hose from the purge VSV.

(c) Disconnect the connector from the purge VSV.

(d) Remove the bolt and purge VSV from the intake air surge tank.

Installation

INSTALLATION

PROCEDURE

1. INSTALL PURGE VSV

(a) Install the purge VSV to the intake air surge tank with the bolt.

Torque:

21 NВ·m {214 kgfВ·cm, 15 ftВ·lbf}

(b) Connect the purge line hose to the purge VSV, and slide the hose clip to secure it.

(c) Connect the purge line hose to the purge VSV.

(d) Connect the connector to the purge VSV.

2. INSTALL V-BANK COVER SUB-ASSEMBLY

2gr-fks Engine Control 2gr-fks Engine Control

Pcv Valve
Components COMPONENTS ILLUSTRATION Inspection INSPECTION PROCEDURE 1. INSPECT PCV VALVE SUB-ASSEMBLY (a) Install a clean hose to the PCV valve sub-assembly. (b) Check the PCV valve sub-a ...

2gr-fks Engine Control
...

Other materials:

Removal
REMOVAL PROCEDURE 1. DRAIN DIFFERENTIAL OIL 2. REMOVE PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY (for 2WD) 3. REMOVE PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY (for 4WD) 4. REMOVE REAR DRIVE PINION NUT (a) Using SST and a hammer, unstake the nut. SST: 09930-00010 (b) for BD20: ...

Open in Bus 5 Main Bus Line
DESCRIPTION There may be an open circuit in one of the CAN main bus lines when the resistance between terminals 15 (CA5H) and 16 (CA5L) of the central gateway ECU (network gateway ECU) is 70 О© or higher. Detection Item Trouble Area Resistance between ter ...

Sound Quality is Bad Only when CD is Played (Volume is Too Low)
PROCEDURE 1. REPLACE CD AND RECHECK (a) Replace the CD with a known good one and recheck. (1) Check if the same malfunction occurs again. OK: Malfunction disappears. OK END NG REPLACE NAVIGATION RECEIVER ASSEMBLY ...

2015-2023 © Copyright www.luting.site